Client: Walsh-Shea Constructors
Construction Cost: $1.27 Billion
Technology: Cut and Cover
Geology: Soft Ground; Young and Old Alluvium
Dimensions: 3 stations, each 806 x 110 ft (245 x 33 m) – 70 ft (21 m) diameter
Length: 13,728 ft (4 km)
Depth: 67-71 ft (20-21 m)
Project Elements
Beverly Hills (Los Angeles), CA
Client: STV Inc.
Construction Cost: $6.3 Billion (3 phases)
Technology: EPBM
Geology: Soft Ground
Dimensions: 18.8 ft ID (5.7 m)
Length: 2.2 mi (3.5 im)
Depth: 50-70 ft (15-21 m)
Project Elements:
Client: Ricondo
Construction Cost: $140 Million
Technology: SEM, Drill and Blast
Geology: Soil/Rock
Dimensions: 22 ft (6.7 m); Tunnel bifurcation up to 48 ft (14.5 m) span
Length: 780 ft (237 m)
Depth: 36-55 ft (11-17 m)
Project Elements:
Client: Washington State DOT
Construction Cost: $3.1 Billion
Technology: EPBM and Cut and Cover
Geology: Soft Ground
Dimensions: 58 ft (17.6 m)
Length: 9600 ft (2.9 km)
Depth: 20-50 ft (6-15 m)
Project Elements:
Client: STV Inc.
Construction Cost: $460 Million
Technology: EPBM
Geology: Soft Ground
Dimensions: 20.3 ft ID (6.1 m)
Length: 2.6 mi (4.2 km)
Depth: 50-70 ft (15-21 m)
Project Elements:
Client: Aeroports de Montreal
Construction Costs: $600 Million
Technology: Drill and Blast
Geology: Rock
Length: 815 ft (250 m)
Diameter: 31 ft (9.6 m) with 79 ft (24 m) span cavern
Depth: 86-142 ft (26-43 m)
Project Elements
Client: City of Columbus
Construction Cost: $375 Million
Technology: EPBM/Slurry TBM
Geology: Karst limestone
Diameter: 20 ft (6 m)
Length: 23,000 ft (7010 m)
Depth: 200 ft (50 m)
Project Elements:
Oakville, ON
Client: Cole Engineering
Construction Costs: $43 Million
Technology: Drill and Blast
Geology: Rock
Length: 2,476 m & 1,575 m
Diameter: 1,200mm (48 in) & 1,350mm (54 in)
Depth: 14 m (46 ft)
Project Elements: